We are building a steel framed kit house.  The frames and windows come prefabricated and the roof sheeting, guttering, wall materials, insulation and linings are supplied.  We are responsible for building approvals,  foundations, electrical wiring, plumbing and drainage.

More about BHP steel frames.
The frames and roof trusses are first assembled with "Tek" screws and held onto the concrete slab foundation with "Titacon" clips and pins. The roof comes next, followed by the plumbing,  windows, bricks, electricals, linings, bathroom and kitchen fittings and the tiling....

Update December 2000:

We have reached the "Gyprock", or plaster board lining stage. The end is in sight. More pictures will be added soon!

Update December 2001:

This takes longer than expected, especially as lots of other stuff like art happens! The lining is almost complete, with two rooms completely finished. All the tanks are in and the plumbing almost complete. The roof no longer leaks in storms ;-) and Mum's piano has taken up residence.

Album of Construction Pictures
Completed frame

Completed frame and roof.

Return

all images on this page
(c) 1999 Liz Yelland